Ambient Environmental Post Abatement Asbestos Air Clearance Report

August 31, 2019 The flooring and ceilings were removed from the center wing of Pierce Hall 8/30-9/1/2019. The flooring was 9"x9" non-friable asbestos-containing tile. The ceiling materials removed did not contain asbestos. All work was done under containment to prevent infiltration of dust to adjacent areas. HEPA vacuums and air cleaners were employed to control...

Pierce Hall Work Planned for 8.30-9.6.2019 - LIMITED ACCESS

Good Afternoon, The night of August 30 th, at 10:00 P.M., demolition of the center wing hallway, ceiling and floor, will begin. The work will be accomplished in two phases and will be completed by September 6 th at 10:00 P.M. Linked here is a floor plan outlining the work areas: https://bit.ly/326GVAO Phase 1 will...

Pierce Hall Renovation Sampling Reports

Below you will find links to all of the testing and reports for Pierce Hall that have been completed since July 7, 2019 as part of and in response to the first floor flooring abatement concerns. August 20, 2019 - Omega Environmental Report on Respirable Silica & Total Dust Pierce Hall July 19, 2019 -...

Occupant Meeting Scheduled tomorrow (July 16) 1PM Rm 2226

Please share this email with your colleagues PIERCE HALL OCCUPANT NOTICE Re: Occupant Meeting Scheduled tomorrow (July 16) 1PM Rm 2226 July 15, 2019 If you were unable to attend the meeting on July 11 or have any additional questions, Planning Design and Construction, Environmental Health and Safety, Risk Management and representatives from the Contractor...

Pierce Hall Renovation Update

July 11, 2019 Planning Design and Construction, Environmental Health and Safety, Risk Management and a representative from the Contractor will be present from 1PM to 3PM today in Pierce Hall Room 2226 to answer questions and to provide additional information. We encourage anyone with questions to attend. For more information on potential health effects from...

PIERCE HALL OCCUPANT NOTICE

All, Please share this will all Pierce occupants. Copies of this notice will be posted on all doors in Pierce Hall. PIERCE HALL OCCUPANT NOTICE Re: SOUTH WING RENOVATION WORK July 10, 2019 On Friday, July 5 through Sunday July 7,2019 renovation work, including asbestos abatement, took place on the first floor south wing corridor...